What was found
(CAN) DURING A 600 HRS INSPECTION, THE COLLECTIVE SPRING ROD ANTICIPATOR WAS FOUND HARD TO OPERATED DUE TO INTERNAL CORROSION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) DURING A 600 HRS INSPECTION, THE COLLECTIVE SPRING ROD ANTICIPATOR WAS FOUND HARD TO OPERATED DUE TO INTERNAL CORROSION.