Service difficulty report · Coupling · Raythn HAWKER900XP

Difficulty date
January 19, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Raythn HAWKER900XP
Aircraft time
2,616 hours
Part
Coupling
Part number
ACM22372
Condition
Leaking
Location
Hyd System
Part time
2,640 hours
Stage of operation
TX
How discovered
O
Nature of condition
K
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) NR 2 MAXARET LEAKING. NR 1 & 2 MAXARET REPLACED WITH OVERHAULED UNITS. BOTH MAXARET COUPLINGS REPLACED WITH NEW UNITS. OVERHAULED MODULATOR VALVE INSTALLED. SYSTEM LEAK CHECK C/W. RESERVOIR SERVICED TO PROPER LEVEL. NOTE: HBC SUSPECTS THE REMOVED MAXARET COUPLINGS ARE WORN OR ARE CRACKED. WITH NEW COUPLINGS INSTALLED NR 2 MAXARET WAS INSTALLED WITH NORMAL SIZED O-RINGS.