- Difficulty date
- March 1, 2012
- Submitted
- September 14, 2015
- Operation
- General aviation
- Part
- G Switch
- Condition
- No Test
- Location
- Elt
- Part time
- 5,943 hours
- Component
- Elt · Artex · 4535002
- Stage of operation
- IN
- How discovered
- C
- Nature of condition
- L
- Precautionary procedure
- K
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) G-SWITCH FOUND FAILED AT ANNUAL INSPECTION.