What was found
(CAN) NEW PROPELLER INSTALLED 03/03/2011 AT 622.7 HRS. RED DYED OIL OBSERVED LEAKING FROM BLADE SHANK. PROPELLER DISMANTLED AND BLADE, O-RINGS WERE FOUND TO BE DEFECTIVE APRIL 23, 2012.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) NEW PROPELLER INSTALLED 03/03/2011 AT 622.7 HRS. RED DYED OIL OBSERVED LEAKING FROM BLADE SHANK. PROPELLER DISMANTLED AND BLADE, O-RINGS WERE FOUND TO BE DEFECTIVE APRIL 23, 2012.