Service difficulty report · G Switch

Difficulty date
March 5, 2012
Submitted
September 14, 2015
Operation
General aviation
Part
G Switch
Condition
No Test
Location
Elt
Part time
6,652 hours
Component
Elt · Artex · 4535002
Stage of operation
IN
How discovered
C
Nature of condition
L
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING REGULAR 12 MONTH INSPECTION, G-SWITCH FOUND FAILED.