What was found
(CAN) DURING A LIGHTNING STRIKE INSPECTION, WHERE THE EXIT POINT WAS ON THE LT ELEVATOR, THE ELEVATOR PCA WERE INSPECTED AS REQUIRED. THE LT ELEVATOR CENTER PCA LINK ASSY BEARING WAS FOUND TO BE VERY LOOSE AND WORN, UNRELATED TO THE LIGHTNING STRIKE. THE BEARING WAS REPLACED AND THE ACFT RETURNED TO SERVICE. PCA LINK ASSY, PN 251N2089-1. BEARING, PN BACB10AD12K. ACFT TSN 62567, CSN 20197.