Service difficulty report · Connector · Bombdr DHC8400

Difficulty date
March 24, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Bombdr DHC8400
Aircraft time
9,316 hours
Engine
Pwc PW150A
Part
Connector
Condition
Damaged
Location
Fuel Temp
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AIR TURNBACK DUE TO NR 2 FUEL TEMP SPIKED AT 95 DEG. NR 2 FUEL TEMP SWITCH ELECTRICAL CONNECTOR REPLACED AND CHECKED SERVICE ABLE ON ENGINE RUN.