Service difficulty report · Spoiler Sys · Emb ERJ190100IGW
FAA SDR system
- Difficulty date
- April 5, 2012
- Submitted
- September 14, 2015
- Operation
- Air carrier
- Make and model
- Emb ERJ190100IGW
- Aircraft time
- 14,396 hours
- Engine
- Ge CF3410E5A1
- Part
- Spoiler Sys
- Condition
- Malfunctioned
- Stage of operation
- NR
- How discovered
- O
- Nature of condition
- O
- Precautionary procedure
- O
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) ON ARRIVAL, THE FLIGHT CREW REPORTED HAVING A SPEED BRAKE DISAGREE ON APPROACH. FLIGHT LANDED NORMALLY T/S SYS. PERFORMED MULTIFUNCTION SPOILER PCU RIGGING IAW AMM 27-65-01. SYS CHECK GOOD. PERFORMED FLT CONTROLS RETURN-TO-SERVICE TEST. NO FAULTS NOTED IAW AMM 27-00-00-070-801-A.
More about the Emb ERJ 190-100 IGW