Service difficulty report · Connector · Emb ERJ170200SU

Difficulty date
April 15, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Emb ERJ170200SU
Aircraft time
15,154 hours
Engine
Ge CF348E5A1
Part
Connector
Condition
Failed
Location
Electrical
Stage of operation
NR
How discovered
O
Nature of condition
M, J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) HOT BATTERY, DECLARED EMERGENCY, RETURNED FOUND WIRING DAMAGED BY BROKEN BACKSHELL AT CONNECTOR P0492. CONNECTOR BACKSHELL REPLACED AND WIRING RETERMINATED IAW SWPM 20-41-10 AND WDM 24036059 P1. BATTERY NR 2 OPS TEST CHECKS SERVICEABLE IAW AMM 24-36-00-710-801-A/500. BATTERY NR 2 REPLACED AND OPS CHECK SERVICEABLE IAW AMM 24-36-01. REMOVED BATTERY, PN: 2726CH1, SN: P02896.