What was found
(CAN) DURING A ROUTINE VISUAL INSPECTION, THE OPERATOR DISCOVERED A BROKEN LUG OF THE MAIN ENTRANCE DOOR LOWER HINGE FITTING . FURTHER INSPECTION REVEALED A CRACK IN THE LUG OF THE UPPER HINGE. THE OPERATOR DECIDED TO INSPECT, LIQUID PENETRANT, ALL THE UPPER AND LOWER HINGES OF HIS REMAINING ACFT. THE INSPECTION REVEALED THAT THE HINGES ON 5 ACFT HAD CRACKED LUGS. THEY THEN DECIDED TO INSPECT THE DOOR HINGES OF THEIR AIRCRAFT. THE DOOR HINGE HAS A DIFFERENT CONFIGURATION. THE LUGS ARE THICKER IN HEIGHT DUE TO THE INSTALLATION OF STRAIGHT BUSHINGS COMPARED TO THE HINGES ON THE 415 WHICH HAS REDUCED HEIGHT LUGS DUE TO THE INSTALLATION OF FLANGED BUSHINGS. THE OPERATOR WAS RECOMMENDED TO REPLACE THE DAMAGED HINGES BEFORE FURTHER FLIGHT ACTIVITY RESUMES. IN 2001 THE SAME PROBLEM WAS REPORTED AND WAS CONSIDERED AN ISOLATED CASE, CHAPTER 5, PSP 495, CALLS FOR A LUBRICATION TASK EVERY 12 MONTHS ON THE DOOR MECHANISM AS WELL AS A ZONAL GVI AT THE SAME INTERVAL. AN ALL OPERATOR MESSAGE AOM WILL BE SENT TO ALL OPERATORS RECOMMENDING THAT PARTICULAR ATTENTION IS GIVEN TO THE HINGES AND THE FINDINGS REPORTED TO ACFT MFG.