What was found
(CAN) CAMPAIGN 7-0018, CARRY OUT INSPECTION OF THE HPT STAGE 2 NOZZLE AND THE HPT STAGE 1, STATOR SHROUD. FOUND 1 STATOR SHROUD L/E SEGMENT WITH 2" CIRCUMFERENTIAL LENGTH MISSING BACK APPROXIMATELY 1" FROM L/E. IAW AMM 72-00-00-290-805 H 01, ITEM 7, N 4 LIMIT IS 0.350" FROM L/E WITH DIAMETER 0.25" AND AREA 0.049". ENGINE REPLACED.