What was found
(CAN) APPROXIMATELY 30MINUTES AFTER DEPARTURE THE CREW REPORTED AN ENGINE 2 BLEED LEAK INDICATION AND ELECTED TO RETURN TO STATION. LANDING WEIGHT WAS 15000KG OVER MAXIMUM. PANPAN WAS DECLARED WITH ATC. MAINTENANCE RESOLUTION: DUCT/PYLON LEAK INSPECTION CARRIED OUT - NIL LEAKS - CMC 362215 TSM 36-22-00-810-897A REVEALED BMC 2 AT FAULT-BMC 2. REPLACED IAW 36-11-34-000-802 . ENGINE HIGH POWER RUN CARRIED OUT NIL FAULTS - SERVICEABLE.