Service difficulty report · Pump · Emb ERJ170200SU

Difficulty date
August 14, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Emb ERJ170200SU
Engine
Ge CF348E5A1
Part
Pump
Part number
5116404
Condition
Leaking
Location
Hyd System
Part time
12,056 hours
Stage of operation
DE
How discovered
O
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) APPROXIMATELY 5 MINUTES BEFORE TOP OF DESCENT, THE CREW RECEIVED A HYDRAULIC SYS 2 LOW QTY INDICATION FOLLOWED BY A HYD 2 FAILURE. AN EMERGENCY WAS DECLARED WITH ATC AND THE QRH WAS FOLLOWED. THE FLIGHT LANDED SAFETLY ON R23 WITH HYDRAULIC FLUID OBSERVED LEAKING FROM THE ACFT. ARRANGEMENTS WERE MADE TO HAVE THE ACFT TOWED TO THE GATE. NO ADVERSE PASSENGER REACTION WAS OBSERVED. MAINTENANCE CONTROL AND THE DUTY PILOT WERE ADVISED. NR 2 ENGINE EDP REPLACED IAW AMM 29-11-01. INSP/CHCK FOR EDP FAIL 05-50-23 CARRIED OUT. OPS CHECK AND LEAK CHECK OF EDP AND FILTERS CARRIED OUT, NO FAULTS FOUND.