Service difficulty report · Trunnion · Cessna 650

Difficulty date
October 9, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Cessna 650
Engine
Garrtt TFE7313C
Part
Trunnion
Condition
Gouged
Location
Mlg
Part time
9,183 hours
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING REPLACEMENT OF THE RT MLG OLEO, THE OTBD GEAR DOOR WAS REMOVED. WHEN REINSTALLING THE DOOR IT WAS NOTICED THAT THE RT MAIN GEAR TRUNNION WAS GOUGED BY THE GEAR DOOR ROD ATTACH POINT BOLT WHEN GEAR IS RETRACTED. CONTACTED FOR DISPOSITION. CARRIED OUT REQUIREMENTS STATED IN LETTER AND RETURNED TO SERVICE. AWAITING FINAL REPAIR DISPOSITION.

More about the Cessna 650