What was found
(CAN) THE NR 2 HYDRAULIC SYS FLUID LEVEL WAS REPORTED AS LOW. MAINTENANCE FOUND THE FLEX LINES TO THE NR 2 EDP LEAKING. THE NR 2 EDP WAS REMOVED AND DEFERRED IAW THE MEL THE MEL PROCEDURE INCLUDES THE REMOVAL OF THE FLEX LINES. UPON REINSTALLATION OF THE EDP THE 2 SUCTION FLEX LINES TO THE EDP, ONE IN THE PYLON AND ONE IN THE NACELLE, WERE FOUND LEAKING. BOTH FLEX LINES WERE REPLACED. LINE PN AE711152-05 & AE711152-75 AIPC 29-11-16, FIG 1-55 & 29-11-52, FIG 5-25. AIRCRAFT TSN 26134, CSN 13317.