Service difficulty report · Pump · Emb ERJ190100IGW

Difficulty date
December 16, 2013
Submitted
September 14, 2015
Operation
General aviation
Make and model
Emb ERJ190100IGW
Aircraft time
18,556 hours
Engine
Ge CF3410E5A1
Part
Pump
Part number
5116404
Condition
Failed
Location
Hyd System
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) APPROXIMATELY 1HR SOUTH HYDRAULIC QUANTITY LEVEL ON NR 1 BEGAN TO DROP. A PATCH WAS DONE THROUGH SFO AND MOC THRU DISPATCH. THE LEVEL CONTINUED TO DROP TILL IT WENT INTO THE BLUE LEVEL. NR 1 EDP FAILED. CREW DECLARED A PAN PAN ABOUT 15 MINS OUT. CFR EQUIPMENT WAS ON STAND BY PASSENGERS WERE BRIEFED BY CREW, ACFT LANDED NORMALLY AND CAME TO COMPLETE STOP ON 17R AND WAS INSPECTED. CLEARED TO TAXI UNDER OWN POWER TO GATE. NO ADVERSE PAX REACTION RESOLUTION: ENGINE NR 1 EDP REPLACED IAW AMM 29-11-01-401 AND INSPECTION CARRIED OUT IAW 05-50-23.

More about the Emb ERJ 190-100 IGW