Service difficulty report · Boot · Beech 100BEECH

Difficulty date
January 9, 2014
Submitted
September 14, 2015
Operation
General aviation
Make and model
Beech 100BEECH
Aircraft time
21,040 hours
Engine
Pwa PT6A28
Propeller
Hartzl HCD4N3C
Part
Boot
Part number
50970101
Condition
Split
Location
Deice System
Part time
21,458 hours
Stage of operation
NR
How discovered
9
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING INSPECTION, THE TAIL DE-ICE BOOTS DID NOT INFLATE DURING OPS TEST. INVESTIGATION NOTED THE TUBE SUPPLYING AIR PRESSURE TO THE RT HORIZONTAL STABILIZER DE-ICE BOOT HAD SPLIT APPROXIMATELY .8750" LONG. THE SPLIT OCCURED AT THE END OF THE HOSE THAT ATTACHES TO THE DE-ICE BOOT NIPPLE. THE SPLIT STARTED WHERE THE TUBE GOES OVER THE BEAD OF THE NIPPLE ON THE DE-ICE BOOT. THIS PART OF THE TUBE IS DIFFICULT TO INSPECT AS THE DE-ICE BOOT MUST BE REMOVED TO SEE THE NIPPLE AND AIR SUPPLY TUBE. THE TUBE WAS REPLACE WITH NEW AND THE SYS TESTED OK. 2 OTHER ACFT IN THE FLEET OF THE SAME TYPE WERE FOUND TO HAVE THE SAME TYPE OF SPLITS IN THE DE-ICE TUBING IN THE TAIL AREA, EITHER THE HORIZONTAL STABILIZER DE-ICE BOOT TUBE OR THE VERTICAL STABILIZER DE-ICE BOOT TUBE.