What was found
(CAN) PERFORMING A SCHEDULE INSPECTION, A VISUAL INSPECTION WAS DONE ON THE LT MAIN BEAM CAP. THE CAP WAS FOUND TO BE CRACKED COMPLETELY THREW. A NEW CAP, PN 205-030-163-095S INSTALLED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) PERFORMING A SCHEDULE INSPECTION, A VISUAL INSPECTION WAS DONE ON THE LT MAIN BEAM CAP. THE CAP WAS FOUND TO BE CRACKED COMPLETELY THREW. A NEW CAP, PN 205-030-163-095S INSTALLED.