What was found
(CAN) DURING SCHEDULED ENGINE CHANGE, PLAY WAS NOTICED AT THE RT NACELLE STRUCTURE OTBD LOWER STRUT ASSY LOWER ATTACHMENT POINT. BOLT, WAS REMOVED AND FRETTING CORROSION WAS NOTICED ON IT AND ON SHEAR BUSHING, 240. BUSHING, 240, WAS ALSO WORN OUT AND THE FLANGE HAD SHEARED OFF. STRUT AND HARDWARE WERE REPLACED.