Service difficulty report · Pump · Bombdr DHC8400

Difficulty date
September 6, 2014
Submitted
March 12, 2015
Operation
General aviation
Make and model
Bombdr DHC8400
Aircraft time
5,313 hours
Engine
Pwc PW150A
Part
Pump
Condition
Failed
Location
Hydraulic Sys
Part time
4,391 hours
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) FLIGHT CREW RECEIVED NR 2 ENGINE, HYDRAULIC PRESSURE CAUTION LIGHT DURING CLIMB OUT. FLIGHT RETURNED TO DEPARTURE AIRPORT. LANDED WITHOUT INCIDENT. NO EMERGENCY DECLARED. NR 2 EDP FAILED, NR 2 EDP WAS REPLACED. FILTERS WERE FOUND TO BE CONTAMINATED, FILTERS REPLACED AND SYS FLUSHED. EDP AND FILTERS SENT TO ACFT OEM TEARDOWN REQUESTED.