Service difficulty report · Turbine · Dhav DHC8314

Difficulty date
December 17, 2014
Submitted
March 12, 2015
Operation
General aviation
Make and model
Dhav DHC8314
Aircraft time
25,449 hours
Engine
Pwa PW123
Propeller
Hamstd 14SF23
Part
Turbine
Condition
Failed
Location
Engine
Stage of operation
CL
How discovered
O
Nature of condition
Y, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING TAKE-OFF & FOLLOWING ROTATION, THE FLIGHT CREW HEARD AN UNUSUAL NOISE FROM THE NR 2 ENGINE AREA. THE FLIGHT CREW OBSERVED ENGINE INSTRUMENT INDICATIONS CONSISTENT WITH AN ENGINE FAILURE & CONDUCTED A SHUTDOWN OF THE NR 2 ENGINE IAW STANDARD OPERATING PROCEDURE. THE AIRCRAFT RETURNED TO THE AIRPORT & LANDED WITHOUT FURTHER INCIDENT. FURTHER INSPECTION BY MAINTENANCE IDENTIFIED THE NR 7 BEARING COVER SEPARATED FROM THE NR 2 ENGINE & SEVERE DAMAGE TO THE POWER TURBINE ASSEMBLY, IT IS PROBABLE THAT THE BEARING COVER LIBERATED ITSELF FROM THE ENGINE DUE TO PT VIBRATION. FOLLOWING REPLACEMENT OF THE NR 2 ENGINE, THE UNSERVICEABLE ENGINE WILL BE SENT TO A REPAIR VENDOR FOR FURTHER INVESTIGATION TO DETERMINE THE ROOT CAUSE OF THE IDENTIFIED FAILURE.