Service difficulty report · Flap System · Beech 1900D

Difficulty date
February 12, 2015
Submitted
March 12, 2015
Operation
General aviation
Make and model
Beech 1900D
Aircraft time
29,624 hours
Engine
Pwa PT6A67D
Part
Flap System
Condition
Inoperative
Stage of operation
CL
How discovered
O
Nature of condition
F
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING TAKE OFF REPORTED THAT THE FLAPS WOULD NOT RETRACT FROM 17 DEGREES TO ZERO DEGREES DURING AIRCRAFT CLEAN UP. THE FLAPS REMAINED AT 17 DEGREES. THE CREW REQUESTED RETURN TO ORIGIN. THE AIRCRAFT LANDED SAFELY WITHOUT FURTHER INCIDENT.

More about the Beech 1900D