What was found
(CAN) LOSS OF HYD FLUID ON NR 1 SYS. ENG WAS SHUTDOWN. MX ACTION FOUND THAT THE NR 2 SIDE, RT AFT QLV AT FAULT, CRACKED & LEAKING. THE VLV WAS REMOVED & SERV UNIT INSTALLED. FUNCTION & LEAK CHECKED SERV.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) LOSS OF HYD FLUID ON NR 1 SYS. ENG WAS SHUTDOWN. MX ACTION FOUND THAT THE NR 2 SIDE, RT AFT QLV AT FAULT, CRACKED & LEAKING. THE VLV WAS REMOVED & SERV UNIT INSTALLED. FUNCTION & LEAK CHECKED SERV.