As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) DURING THE FINAL INSPECTION OF SB100-24-24 THE INSPECTOR NOTICED THAT THE POSITIVE FEED CABLES FROM THE APU GENERATOR, SAD0001 AND SAD0002, TRANSITION UNDER THE RIGHT HYDRAULIC EQUIPMENT RACK MAKE LIGHT CONTACT WITH A NR 2 HYDRAULIC RETURN LINE, TUBE ASSEMBLY. MANAGED TO BEND THE APU GENERATOR FEED CABLE BUNDLE AWAY FROM THE RETURN LINE TO SUFFICIENTLY CLEAR AND STOP THE RUBBING.