What was found
(CAN) WHILE ENROUTE, THE PACK ON THE RT SIDE OVERHEATED. THE CAPTAIN DECLARED A PAN PAN WITH ATC AND INITIATED A DESCENT TO 10,000 FT DUE PRESSURIZATION CONCERN. WHILE AT THE LOWER ALTITUDE, THE RT PACK COOLED OFF SUFFICIENTLY TO RE-START IT. CAPT INITIATED A CLIMB UP TO FL240 AND IS CONTINUING TO DESTINATION. RESOLUTION IAW FIM 21-61-00-810-829A REPLACED 32HH COMPRESSOR SENSOR IAW AMM 21-61-11. ON LEAK CHECK FOUND ACM RUBBER HOSE, PN 3455-23, TORN ABOUT 2" LONG HOSE REPLACED, OPS CHECKED OK.