Service difficulty report · Bearing · Boeing 767223

Difficulty date
November 2, 2015
Submitted
April 22, 2016
Operation
General aviation
Make and model
Boeing 767223
Aircraft time
77,692 hours
Engine
Ge CF680A
Part
Bearing
Condition
Overheated
Location
Hyd Pump
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) INITIAL INDICATION WAS A STATUS MESSAGE, C HYD SYS MAINT. A CHECK OF THE HYDRAULIC PRESSURES REVEALED THE CENTER HYD SYS WAS BELOW NORMAL PRESSURE, 2010 PSI. QUANTITIES ALL OK. WITHIN A FEW MINUTES THERE WAS AN EICAS MESSAGE OF, C1 HYD PRESSURE, FOLLOWED BY C1 HYD OVERHEAT. HYD PRESSURE, CENTER, STARTED TO FLUCTUATE BETWEEN 1400 PSI AND 2600 PSI, AND CONTINUED UNTIL LANDING. REQUEST STRIP REPORTS FROM VENDORS. 2 ACMPS REPLACED AND ADP MANIFOLD.