What was found
(CAN) AT APPROXIMATELY 10KTS ON THE TAKEOFF ROLL THE CREW REPORTED 3 COMPRESSOR STALLS FROM THE LT ENGINE. A LOW SPEED REJECT WAS CARRIED OUT AND THE ACFT RETURNED TO THE GATE FOR INSPECTION. THE ACFT HAD BEEN DEICED AND SNOW WAS STILL FALLING. RESOLUTION TSM TASK 75-31-00-200-001 MANUAL OPS CHECK OF VBV DOORS C/O. VISUAL CHECK OF VSV SYS. NO FAULTS. BORESCOPE INSPECTION OF HPC STAGE1, 3, 8 BOOTER AND CUMBUSTION CHAMBER C/O. NO DEFECTS NOTED. FAN COWL CLOSURE. POWER ASSURANCE CHECK C/O IAW AMM 71-00-00-710-008 ALL PARAMETERS WITHIN LIMITS.