Service difficulty report · Pump · Bombdr DHC8402

Difficulty date
January 2, 2016
Submitted
April 22, 2016
Operation
General aviation
Make and model
Bombdr DHC8402
Engine
Pwc PW150A
Part
Pump
Condition
Failed
Location
Hydraulic Sys
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) "30 MIN AFTER T/O, IN CRUISE PHASE OF FLIGHT MC NR 2 ENG HYD PUMP LIGHT ON. QRH PROCEDURE COMPLETED AND IN CONTACT WITH OPC AND MCC DIVERTED TO AIRPORT. HYD PUMP FAILED. PUMP REPLACED, SYS FLUSHED AND SYS BLEEDS CARRIED OUT IAW AMM 29-10-00-617-803 R52. ACFT WAS RTS 21 HRS LATER.