Service difficulty report · Wire · Bombdr DHC8400

Difficulty date
February 12, 2016
Submitted
April 22, 2016
Operation
General aviation
Make and model
Bombdr DHC8400
Aircraft time
5,792 hours
Engine
Pwc PW150A
Propeller
Dowty R4086123F17
Part
Wire
Condition
Shorted
Location
Prop De-Ice
Part time
5,870 hours
Stage of operation
CR
How discovered
9
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) THE PROP DEICE SYSTEM BECAME UNSERVICEABLE IN FLIGHT. THE DEICE WIRE HARNESS WAS FOUND SHORTED AND REPLACED, AND THE BRUSH BLOCK WAS REPLACED AS A PRECAUTION. SATISFACTORY CHECKS WERE THEN CARRIED OUT.