What was found
(CAN) BA SER CASE: 44013 `AS PER TC AND BA AGREEMENT, A SDR MUST BE CREATED FOR EACH ETOPS EVENT` SER -ETOPS - ELECRICAL FAULT - GEN INOP (R/H ENGINE) AIRPORT: BUD - STATUS: A/C RTS: 0 TOTAL COMPLETE DAY(S) OOS/24 ELECTRICAL POWER/COMMENTS: CREW REPORTED 24 ELECRICAL FAULT - GEN INOP. OOS AT 13:05UTC (15:05 RIX) 13 APR 2019 BT492 CANCELLED RHE GCU REPLACED A/C FERRIED TO RIX RTS AT 19:15UTC (21:15RIX) 13 APR 2019. TOTAL OOS TIME 6HRS 10MIN (TC# 20190415004)