Service difficulty report · Liner · Airbus BD5001A11

Difficulty date
April 23, 2019
Submitted
August 17, 2020
Operation
General aviation
Make and model
Airbus BD5001A11
Part
Liner
Condition
Burned
Location
Engine
Part time
2,152 hours
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) L/H ENGINE COMBUSTION CHAMBER BORESCOPE INSPECTION. LINER SEGMENT BURN THROUGH DAMAGE, ENGINE TO BE REPLACED WITHIN 10 FC L/H ENGINE REPLACED (TC# 20190424006)

More about the Airbus BD-500-1A11