As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(CAN) DURING ACCOMPLISHMENT OF SCHEDULED MAINTENANCE TASK DH4-73-21-06-RR-802-LM (REPLACEMENT OF THE FMU TRANSFER TUBES) AN AME NOTED THAT THE FUEL TRANSFER TUBE BRACKET ON THE LEFT ENGINE WAS CRACKED. THE ASSEMBLY WAS REPLACED WITH SERVICEABLE AND THE AIRCRAFT RETURNED TO SERVICE. AIRCRAFT HOURS: 17775, CYCLES: 14318. (TC# 20190524018)