Service difficulty report · Circuit Breaker · Bombdr DHC8400

Difficulty date
June 25, 2019
Submitted
August 17, 2020
Operation
General aviation
Make and model
Bombdr DHC8400
Aircraft time
4,811 hours
Part
Circuit Breaker
Condition
Tripped
Stage of operation
CR
How discovered
9
Nature of condition
G
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) IN CRUISE, L LWR CB N10 RELEASED, 20 MIN LATER J10 AND K10 RELEASED. UPON FLAP SELECTION L7 RELEASED (WITH ASSOCIATED FLAP POWER CAUTION). AFTER SHUTDOWN RH N10 RELEASED. THE PREVIOUS DAY, PRIOR TO PUTTING POWER ON THE THE A/C FOLLOWING RON, FOUND NUMEROUS CB`S RELEASED. EPCU WAS REPLACED AT THAT TIME BUT DEFECT OCCURRED ON SUBSEQUENT FLIGHT AS DESCRIBED ABOVE. IN-WORK, SDR WILL BE UPDATED UPON DEFECT RESOLUTION. (TC# 20190627007)