Service difficulty report · O-Ring · Cndair CL6002B19

Difficulty date
February 16, 1996
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Cndair CL6002B19
Part
O-Ring
Condition
Failed
Location
#3 Hydraulic
Part time
1,620 hours
Stage of operation
AP
Nature of condition
K
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN)LOST #3 HYDRAULIC SYSTEM ON APPROACH. HIGH PRESSURE MANIFOLD FLUID SAMPLE PLUG FOUND LEAKING. O-RING REPLACED.