What was found
(CAN)DURING A SCHEDULED 500 HOUR HEATER PRESSURE DECAY TEST, LEAKAGE RATE WAS FOUND TO BE EXCESSIVE. UNABLE TO PINPOINT THE EXACT LOCATION DUE TO ACCESS PROBLEMS. HEATER WAS REPLACED AND SENT FOR OVERHAUL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN)DURING A SCHEDULED 500 HOUR HEATER PRESSURE DECAY TEST, LEAKAGE RATE WAS FOUND TO BE EXCESSIVE. UNABLE TO PINPOINT THE EXACT LOCATION DUE TO ACCESS PROBLEMS. HEATER WAS REPLACED AND SENT FOR OVERHAUL.