What was found
(CAN)NO IGNITION, MOISTURE NOTICED IN IGNITOR TIPS. TWO IGNITORS AND CABLE ASSEMBLIES REPLACED. 953.6 HOURS THIS INSTALLLATION. AIRCRAFT RETURNED TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN)NO IGNITION, MOISTURE NOTICED IN IGNITOR TIPS. TWO IGNITORS AND CABLE ASSEMBLIES REPLACED. 953.6 HOURS THIS INSTALLLATION. AIRCRAFT RETURNED TO SERVICE.