Service difficulty report · Shaft · Boeing 767233

Difficulty date
June 8, 1996
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Boeing 767233
Engine
Pwa JT9D7R4D
Part
Shaft
Condition
Sheared
Location
Nr 2 Eng Idg
Stage of operation
CL
Nature of condition
J, K
Precautionary procedure
E

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ONE-HALF HOUR INTO FLIGHT THE #2 ENGINE OIL QUANTITY DROPPED TO ZERO, WITH OIL PRESSURE FLICKERING AND OIL PRESSURE DROPPING TO AMBER BAND. #2 ENGINE SHUTDOWN. POST FLIGHT INSPECTION FOUND INTEGRATED DRIVE GENERATOR (I.D.G.) QUADRANT RING SCREW SHEARED AND I.D.G. SHAFT SHEARED. REPLACED I.D.G. AND QUADRANT RING ASSEMBLY. GEARBOX INSPECTED AND ENGINE GROUND RUN SERVICEABLE.