Service difficulty report · Switch · Mtsbsi MU2B35

Difficulty date
November 26, 1996
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Mtsbsi MU2B35
Engine
Garrtt TPE3316
Part
Switch
Part number
21EN96
Condition
Frozen
Location
Nlg Downlock
Part time
46 hours
Stage of operation
AP
Nature of condition
J
Precautionary procedure
L, H, O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ON APPROACH WHEN GEAR SELECTED DOWN, NO RESPONSE. GEAR LOWERED MANUALLY. IT IS ASSUMED THAT THE NOSE GEAR DOWN LOCK SWITCH HAD PICKED UP WATER CONTAMINATION INTERNALLY ON THE PREVIOUS TAKEOFF AND HAD FROZEN AS THE AIRCRAFT HAD BEEN FLYING FOR OVER AN HOUR IN MINUS 30 DEGREE TEMPERATURE. NEW SWITCH INSTALLED AND COATED WITH RTV. SWITCH IN A VERY VULNERABLE POSITION TO PICK UP CONTAMINATION.