Service difficulty report · Contactor · Braero HS7482B

Difficulty date
August 13, 1997
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Braero HS7482B
Part
Contactor
Part number
D6311
Condition
Burnt
Location
Nr 1 Eng Int Lip
Component
Rotax · D7311
Stage of operation
CR
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AFTER LANDING CREW REPORTED NO ANTI-ICE ON NR1 ENGINE INTAKE. INSPECTION OF CONTINUOUS LIP HEAT RELAY FOUND THE UNIT SEVERELY OVERHEATED WITH INDICATIONS OF LOCAL FIRE IN THE AREA OF THE NACELLE WHERE THE UNIT IS LOCATED. REPLACED.