Service difficulty report · Apu · Cndair CL6002B19

Difficulty date
November 18, 1997
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Cndair CL6002B19
Engine
Ge CF343A1
Part
Apu
Condition
Leaking
Location
Bleed Sys
Part time
3,316 hours
Stage of operation
NR
Nature of condition
B
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) LAVATORY SMOKE CAUTION MESSAGE AND MIST IN THE CABIN. AUXILIARY POWER UNIT (APU) SUSPECTED OF ALLOWING OIL INTO THE BLEED AIR SYSTEM. NO FAULTS FOUND.