Service difficulty report · Attach Fitting · Dhav DHC2MK1

Difficulty date
March 4, 1998
Submitted
January 19, 2001
Operation
General aviation
Make and model
Dhav DHC2MK1
Aircraft time
19,542 hours
Engine
Pwa R985AN14B
Part
Attach Fitting
Condition
Corroded
Location
Lt Mlg
Part time
18,195 hours
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) FORWARD LEFT HAND LANDING GEAR ATTACH POINT FOUND CORRODED BEHIND FLOAT FITTING.TUBE AND ATTACH FITTING HAD LITTLE OR NO METAL LEFT.SB2/49 WAS COMPLIED WITH THIS AREA NOT CALLED UP IN INSPECTION FOR SB.THIS IS THIRD FINDING.