Service difficulty report · Tube · Dhav DHC7*

Difficulty date
March 30, 1998
Submitted
March 26, 2000
Operation
General aviation
Make and model
Dhav DHC7*
Part
Tube
Condition
Chafed
Location
Nr 2 Hyd Sys
Stage of operation
TX
Nature of condition
K, J
Precautionary procedure
H

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AT THE END OF THE LANDING ROLL IT WAS NOTICED THAT NR 2 HYDRAULIC QUANTITY GAUGE WAS AT ZERO. THEN WHEN TAXIING ONTO RAMP, THE NR 1 HYDRAULIC PUMP FAILED. INVESTIGATION FOUND A HYDRAULIC LINE BADLY CHAFED WITH A SMALL HOLE ALLOWING NR 2 SYSTEM TO DRAIN MOST FLUID. IT IS BELIEVED THAT GEAR SELECTION AND LOWERING CAUSED THE CHAFED LINE TO FINALLY BURST.