Service difficulty report · Seal · Cessna 172M

Difficulty date
May 27, 1998
Submitted
March 26, 2000
Operation
General aviation
Make and model
Cessna 172M
Engine
Lyc O320E2D
Propeller
Mcauly 1C160DTM
Part
Seal
Part number
055211313
Condition
Broke
Location
Airbox
Part time
2,000 hours
Stage of operation
NR
Nature of condition
C
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) SEAL ON THE AIR BOX ASSEMBLY BROKE OFF AND WAS INGESTED INTO THE CARBURETOR. THE ENGINE WOULD NOT RUN ABOVE IDLE.

More about the Cessna 172M