What was found
(CAN) PROPELLER RECEIVED FOR CORROSION INSPECTION. PREVIOUS INSTALLATION/REMOVAL IN JULY 1965. THIS INSTALLATION ENTRY AT 269 HOURS. NO LOG BOOK ENTRIES OF REPAIRS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(CAN) PROPELLER RECEIVED FOR CORROSION INSPECTION. PREVIOUS INSTALLATION/REMOVAL IN JULY 1965. THIS INSTALLATION ENTRY AT 269 HOURS. NO LOG BOOK ENTRIES OF REPAIRS.