Service difficulty report · Line

Difficulty date
July 7, 1999
Submitted
March 26, 2000
Operation
Air carrier
Engine
Ge CF680C2B6
Part
Line
Condition
Loose
Location
Oil System
Stage of operation
CR
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) NR 2 ENGINE OIL QUANTITY INDICATED ZERO AT CRUISE. OIL PRESSURE REDUCED TO 46 PSI. ENGINE THRUST REDUCED TO IDLE, FLIGHT DIVERTED. OIL LEAK ISOLATED TO LINE AT OIL PRESSURE TRANSMITTER. LINE TIGHTENED, LEAK CHECK CARRIED OUT. SYSTEM SERVICEABLE.