What was found
INSPECTION FOUND THE LOWER ANTI-COLLISION BEACON PANEL ATTACH STRUCTURE CORRODED AND A 3 CRACK IN INTERCOSTAL. THE CORROSION WAS REMOVED AND FOUND WITHIN LIMITS IAW SRM 51-10-03 AND 53-01, FIGURE 1. THE INTERCOSTAL WAS REMOVED AND A NEW INTERCOSTAL WAS INSTALLED USING TWO ANGLES IAW SRM 51-10-04, 51-10-03, 51-30-01, AND 51-30-02.