What was found
INSPECTION FOUND A 1 INCH CRACK IN AFT CARGO CENTER FLOOR TRANSITION PANEL AT STA 1212 - 1231. THE CRACKED AREA WAS TRIMMED OUT IAW SRM 53-01, FIGURE 4, SHEET 3. DOUBLER AND FILLER WERE INSTALLED IAW SRM 53-01, 51-10-4, 51-10-3, AND 51-30-2.