What was found
INSPECTION FOUND NR 1 GALLEY SUPPORT FITTINGS (TWO EACH) CORRODED IN FASTENER HOLES AT STA 160, RBL 44 AND RBL 50. THE FITTINGS WERE REMOVED AND NEW FITTINGS WERE INSTALLED IAW SRM 51-30-5, 51-10-4, AND 51-10-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION FOUND NR 1 GALLEY SUPPORT FITTINGS (TWO EACH) CORRODED IN FASTENER HOLES AT STA 160, RBL 44 AND RBL 50. THE FITTINGS WERE REMOVED AND NEW FITTINGS WERE INSTALLED IAW SRM 51-30-5, 51-10-4, AND 51-10-3.