As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FRAME CRACKED AT STATION 827 S-9LT. PERFORMED INTERIM REPAIR BY REMOVING DAMAGE, PERFORMING NDT INSPECTION, FABRICATING AND INSTALLING REPAIR DOUBLERS PER ECRA 5310-04807 PART 1. INITIATED DIP 089441 TO PERFORM THE INSPECTION PER ECRA 5310-04807 PART 2 ON THE FRAME REPAIR BETWEEN S-8 AND S-9, ON LEFT SIDE STATION 827 BEFORE 56250 TOTAL AIRCRAFT CYCLES.