What was found
FOUND FASTENER AT STA 368 AROUND S-30 DAMAGED BY LIGHTNING STRIKE. TOTAL DAMAGE 0,250 IN RIVET HEAD DAMAGE 0,091 IN. PER SRM 53-00-01 P103 TABLE III DETAIL IV NEEDS FASTENER REPLACEMENT WITHIN 50 FLIGHT CYCLES. PERFORMED INTERIM REPAIR PER PART 1-2. PERFORM INSPECTIONS AT INTERVALS NOT TO EXCEED 30 DAYS AND ACCOMPLISH A PERMANENT REPAIR WITHIN 90 DAYS. REFERENCE L/P 9100380 FOR INTERIM REPAIRS AT STATION 325, 347 AND 412. ALL WORK WAS PERFORMED FROM ECRA 5330-03837. INSPECTED INTERIM REPAIR AT STATION 368 IAW ECRA 5330-03837, PART 2, NO DEFECTS NOTED. INSPECTED AREA, REF ECRA 5330-03837 PART II, REPAIR SECURE. NO FURTHER DAMAGE. DIP REMAINS. FUSELAGE SKIN STA 368 S30L REPAIRED AS PER ECRA 5330-03837 REV D PART 3 ITEM 3 AND BLIND FASTENER REPLACED SOLID FASTENER AS PER SRM 53-00-01 REPAIR 8 FIG 201. HFEC NO CRACK FOUND. FOUND LIGHTNING STRIKE DMG, STA 368, STR 30LT, AT RIVET PER SRM 53-00-01, ALLOWABLE DMG 1, PG 103,TABLE 3, C/W REPAIR 8 W/I 50 FLT CYC''S. ISSUED DIP CONTROL NR D 089867 PER EC/RA 5330-03837 REV A FOR INTERIM REPAIR AT LOCATION STA 368 S-30 REVISE INSPECTIONS TO BE PERFORMED AT INTERVALS NOT TO EXCEED 30 DAYS AND ACCOMPLISH A PERMANENT REPAIR WITHIN 90 DAYS. PER MRB DIP EXT DATED 08-30-08, LIMITS REVISED AS FOLLOWS: 1) RIR: EVERY 30 DAYS & 2) T/A: W/I 90 DAYS.